Module Code HIWAY 6009
1. Road Pavement Aggregates - Characteristics - Sampling and testing procedures (NZS4407: Clay index; sand equipvalent; ceanness value; crushing resistance; weathering quality index; abrasion resistance) - Properties required to perform adequately in road (shear, durability, etc.)
2. Quarries - Legislative and by-laws - Management plan approval - Road aggregate production - Aggregate storage
3. Earthworks Operations - Earthworks planning and design - Setting out - Cut, fill, borrow - Operations, control - Batter slopes - Vegetation cover
4. Subgrade Preparation - Subgrade elevation - Planning and implementation of construction phases - Setting out - Methods of subgrade construction - Plant and equipment selection - Quality control - Soft areas (excavation, geotextiles) - Soil improvement options - Specifications, standards (TNZ F/1)
5. Base and Sub-Base Construction - Planning and implementation of construction phases - Plant and equipment selection - Construction processes - Specifications, standards (TNZ M/3 Notes: M/4 & B/2) - Quality control - Surface preparation to wearing surface application
6. Soil Improvement (Stabilisation) - Lime stabilisation - Cement - Modification vs cementation - Testing - Construction procedure - Quality control - Safety - Bitumen stabilisation
7. Geosynthetics - Geogrid and geotextiles
Examination - 3 hours
Further Information
For further information please contact |